• Time Office:
    Mon / Fri: 9 am to 5 pm

LISI Auto in Heidelberg production base upgrade 494

 

PROJECT DYNAMIC MAP

DESCRIPTION

A design mission from: conception to details. These separate structures were included: [1] Hardening Shop – precast concrete structure [2] Quality Control Room – masonry [3] Main Storage – steel structure [4] A canopy between [1] and [3] – steel structure [5] Logistic canopy – steel structure [6] Furnaces foundations in [1] – reinforced concrete structure It was a challenge: to design in accordance with German annexes of the Eurocodes and the designed to be approved by German control engineer.