A steel structure for conveyor longer than 120m. A tunnel under factory road. Cantilever part longer than 33m and height 28m. Tension tower for conveyor belt. All these structures well balanced by wise design.
A steel structure for conveyor longer than 120m. A tunnel under factory road. Cantilever part longer than 33m and height 28m. Tension tower for conveyor belt. All these structures well balanced by wise design.
Underground tunnels below ore stockpile. One used for escape corridor, another for ore transportation conveyor. Tunnels walls and roof designed for weight of up 25m high stack of heavy rocks. Supporting steel structure of the mechanical parts included in design. Challenge was penetration in existing building as a column was on the way of the
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |