2 year design project for systems of new & reconstructed pipe& cable racks with ADM Razgrad factory. Complexity came from the great number of technological lines and many existing obstacles to consider. Capacitive design principles implemented in seismic checks of the new & reconstructed structures. Prepared shop drawings of entire 466t steel structures.







