• Time Office:
    Mon / Fri: 9 am to 5 pm

New Chimney, Kraft Foods, Svoge 399

MAIN

PROJECT #399

kraft foods 512x512 cssproject eu
Customer : Mondeleez Bulgaria Production EOOD | гр. Своге ул.Република №1
Period : 2013
Contractor : IPS Bulgaria
Tags : chocolate • concrete • steel
LOCATION

Coordinates :
KML file : Download KML file
DOCUMENTS

 

PROJECT DYNAMIC MAP

DESCRIPTION

Boilers and steam generators in Chocolate Factory were upgraded by previous project. These start working with CNG. Extra water created in burning CNG penetrates within concrete walls of used 63m high reinforced concrete chimney. This, together with the freeing temperatures in winters lead to critical status of the chimney. Chimney with such height was not more needed as burn gases were much more clear. This pilot project for us within the Chocolate Factory consist of design of new chimney, 34m high, constructed with stainless steel and reinforced concrete. Ducting from steam generators and boilers were also designed. Aerodynamic stabilizer was integrated within chimney structure. Later on old chimney was demolished.