• Time Office:
    Mon / Fri: 9 am to 5 pm

NPP Kozloduy, Reconstruction of exiting building “New Electrolysis Station”into “Repair and Maintenance Building” 374

MAIN

PROJECT #374

npp kozloduy 512x512 cssproject eu
Period : 2011
Contractor : Niproruda
Tags : concrete • steel • nuclear • reconstruction
LOCATION

Coordinates :
Google Earth [LINK] & Google Earth [PROJECT]
KML file : Download KML file

 

PROJECT DYNAMIC MAP

DESCRIPTION

“New Electrolysis Station” is a building built around 1990. A system MC’83 for precast elements assembly was used. The contemporary needs require its new function: for repairs and maintenance workshop. Reconstruction works include: new floors, wall penetrations, crane beams demolition. The design challenge was to fully understand old project documentation and wise use of steel elements for realization of architectural ideas. Full set of shop drawings were produced in addition.

 

P.S. By security & confidentiality reasons given coordinates are approximate.